The Mineral Resources, inclusive of the Mineral Reserves inventory reflect the May 2015 NI 43-101 Technical Report estimates, depleted to December 31, 2018.

Mineral Resource - as at December 31, 2018, and reported using a 0.2% TCu cut-off

Classification Tonnes (Mt) TCu (%) ASCu (%) Ni (%)
Total Measured 617.0 0.56 0.02 0.002
Total Indicated 258.7 0.46 0.01 0.002
Total Meas. plus Ind. 875.7 0.53 0.02 0.002
Total Inferred 135.9 0.37 0.01 0.004

The current depleted Mineral Resource as at December 31, 2018 was estimated and verified by David Gray of the Company who is a qualified person and holds the following valid qualifications: BSc Hons(Geo), MAusIMM, Pr.Sci.Nat.

Mineral Resource Statement for Sentinel Stockpiles as at December 31, 2018

Classification/Stockpile Tonnes (Mt) TCu (%) ASCu (%)
Total Measured 0.2 0.53 -
Total Indicated 29.4 0.27 -
Total Meas. plus Ind. 29.5 0.27 -

The current stockpile Mineral Resource inventory as at December 31, 2018 was verified by David Gray of the Company who is a qualified person and holds the following valid qualifications: BSc Hons(Geo), MAusIMM, Pr.Sci.Nat.

Mineral Reserves

The Mineral Reserve estimate for the Sentinel project as listed in the table below has been based on conventional Whittle 4X optimization, followed by detailed life of mine design and planning accounting for staged pit cutbacks to suit in-pit ore crushing and conveying plus trolley assisted waste haulage, and comprehensive ore and waste mining/production scheduling.

The statement is consistent with depletion from the estimate produced for the May 2015 NI 43-101 Technical Report. The predicted plant recoveries are consistent with previous Mineral Reserve estimates, and the estimated marginal cut-off grade is based on the long-term consensus copper price of $3.00/lb Cu.

Mineral Reserve as at December 31, 2018, and reported based on a long-term $3.00/lb Cu price

 Classification

Non-primary Sulphide Ore  Primary Sulphide OreTotal Ore 
Ore (Mt) TCu (%) AsCu (%)  Ore(Mt)TCu (%)  AsCu (%) Ore (Mt)TCu (%) AsCu (%) 
Total Proven 50.7 0.44 0.08 618.5  0.50 0.02 669.2 0.50 0.02
Total Probable 10.9 0.44 0.08  131.2  0.51  0.02  142.1  0.50  0.02
Total Mineral Reserves 61.6 0.44 0.08  749.7  0.50  0.02  811.3  0.50  0.02

The current depleted in-pit Mineral Reserve as at December 31, 2018 for Sentinel has been estimated and verified by the Company’s personnel under the supervision of Michael Lawlor of the Company, who is a qualified person and holds the following valid qualifications: BEng (Mining)(Hons), MEngSc, FAusIMM. The total Measured Mineral Reserve is less than the corresponding total Proven Mineral Reserve for reasons of different cut-off grade criteria.

Mineral Reserve Statement for Sentinel Stockpiles as at December 31, 2018

 Classification

Non-primary Sulphide OrePrimary Sulphide Ore Total Ore 
Ore (Mt) TCu (%) AsCu (%)  Ore (Mt)TCu (%) AsCu (%)  Ore (Mt)TCu (%) AsCu (%) 
Total Proven - - -  0.2 0.54  - 0.2 0.54
Total Probable 5.3 0.37 -  24.1  0.24  -  29.4  0.27  -
Total Mineral Reserves 5.3 0.37 -  24.2  0.25  -  29.5  0.27  -

The current stockpile Mineral Reserve inventory as at December 31, 2018 for Sentinel has been verified by the Company’s personnel under the supervision of Michael Lawlor of the Company, who is a qualified person and holds the following valid qualifications: BEng (Mining)(Hons), MEngSc, FAusIMM.

The total Mineral Reserve inventory inclusive of stockpiles is 840.8 Mt at an average grade of 0.49% TCu. At current throughput rates the remaining life of mine is approximately 16 years.