FAQs

Following illegal blockades of the international port and mine access road, Cobre Panama halted production in November 2023. Following a request from the Government of Panama in December 2023, which followed a ruling by the Supreme Court, First Quantum, Cobre Panama was placed into a temporary phase of Preservation and Safe Management. This means we are working with a smaller team to implement environmental stability and asset integrity measures as we continue to manage the mine safely and responsibly.

We have many environmental programmes underway around Cobre Panama. These plans focus on conservation of biodiversity and forests. We have a protected area action plan that protects over 200,000 hectares of land and includes a $5m annual expenditure on biodiversity.

Our reforestation plan commits us to reforesting 11,175 hectares of forest, including restoring native forests and a footprint rehabilitation plan that will protect the area affected by our mining footprint. In total, our protected conservation area is 30 times larger than our Mine’s footprint.

We also have species level conservation plans, including specialised biodiversity training for all mining employees and collaboration with conservation organisations such as the Smithsonian Tropical Research Institute, the Sea Turtle Conservancy and the Peregrine Fund. As part of this we are committed to protecting 18 species listed between near threatened and critically endangered within our conservation area. Our long-term funding and support agreement has been signed with the Panamanian Ministry for Environment, creating external checks and ensuring we follow through on our commitments.

Our audit programme is made up of internal and external audits based on ISO14001 – the international standard for Environmental Management Systems. The external audits are carried out by certified companies with experience in mining and environmental sectors. They take a systematic approach to ensure robust and consistent procedures are in place so that we maintain a strong environmental management system. In addition, we have our own internal audit programme. This approach is created tailored to each mine that we operate and is implemented by personnel with expertise on the subject matter. These reviews not only provide a detailed assessment of environmental performance but allow us to share knowledge between sites and continuously improve. After each report, action plans are created and implemented to address their findings and control any risks unearthed. We follow up on and evaluate our progress on a monthly basis and report to the group when further analysis or support is required.

We take a collaborative approach to build meaningful community programmes that matter to people in the areas where we work. We work alongside governments and local leaders to find projects with a focus on education, infrastructure, sanitation and healthcare.

Since 2013, we have invested over $50 million in diverse social projects. Some of our notable projects include;

  • The establishment of the Training Centre for Industrial Professionals, which provides tuition-free technical education endorsed by the National institute of Education and Training for Human Development to people aged 18 to 35.
  • Construction of a bridge in San Juan de Turbe, extending its benefits to communities in nearby districts and thereby improving accessibility and connectivity, as well as eight other community bridges facilitating transportation and serving approximately 1,800 people.
  • Enhanced potable water supplies for five surrounding communities, ensuring clean drinking water access for all residents.
  • Implemented improved water storage and supply systems in the Santa Ortis community, directly benefiting 300 residents.
  • Upgraded infrastructure at 15 schools, impacting a total of 877 students, including a dining room and canteen at School Nuevo Eden, providing essential facilities for 57 students and three teachers.
  • Supplied materials and labor to enhance the Health Center, Miguel de la Borda, ensuring better healthcare access for approximately 3,500 people in the community.

In addition to our community projects, we also create and employ jobs. At the height of the mine, we provided more than 2% of national employment in Panama, with Panamanians representing 89% of mine employees.

99% of the water used at the mine comes from rainwater. It does not use water that could affect the availability of water for the Panama Canal.

All project water passes through our tailings storage facility for a physical settling process and is discharged from a single point of discharge in compliance with national regulations. This single point of discharge of water is continually monitored and compliance maintained with issued permitting.

Our tailings are mostly inert material such as rainwater, lime and ground rock, and no cyanide or mercury is used in the copper extraction process.

Cobre Panama encourages its surrounding communities to carry out Citizen Participatory Monitoring. This is where residents oversee the taking of samples, the chain of custody and the analysis and results of water quality testing. An international independent technical organization educates, trains and advises local communities throughout the entire process. This initiative has been carried out with consultants from AVANZAR for 12 years. Members from 11 communities surrounding the mine are organized. Prior to the start of operations, a baseline was established against which all monitoring is checked. As a result, the mine has more than 260 water quality control points operating ensure external monitoring.

We contribute to the mine, not only through the employment of our local workforce, but also through taxes, royalties and contracts throughout our supply chain.

The mine has provided over 7,000 direct jobs with an average salary of over $2,000 per month and more than $900 million in contracts to Panamanian-based companies since 2015. Furthermore, Cobre Panama employs indirectly more than 33,000 jobs. In full flow it contributed around 5% of GDP and employs more than 2% of Panama’s total workforce. We also provide training and development for the local community to enable the local workforce to fill open job roles, and support for the local community after consultation with local leaders to find which programmes are needed the most.

The mine is one of the youngest copper mines in the world, and one of the top 10 largest. At full operation it was providing an estimated 1.5% of the global copper supply.

This copper is vitally important in our lives, it’s in our homes, our phones and our cars, and it is a vital component in the clean energy transition. A single 660-Kw wind turbine contains 350kg of copper, whilst a PV solar power plant contains approximately 5.5 tons of copper per megawatt of power generation. In addition, Cobre Panama alone can produce enough copper for 6 million electric vehicles each year.

Our business has zero tolerance for corruption of any kind. The Company has operated successfully across multiple jurisdictions for over 25 years and has always conformed to the highest ethical standards and international best practices in its business conduct, and in its respect for local and domestic laws. In addition, as a Canadian company, the Company is strictly bound by Canada’s robust anti-bribery and corruption laws. Such laws have extraterritorial reach and prohibit irregular payments to foreign officials anywhere in the world, and in many circumstances make such payments a criminal offense.

One of the most important things to consider when designing a tailings storage facility (TSF) are the local conditions. Our TSF’s are therefore designed according to the specific local conditions at site; including climate, seismicity, geology, hydrogeology and environmental protection which are often a unique combination at each operation.

They are designed by Certified Professional Engineers with many years of relevant experience and then peer reviewed by leading global experts prior to construction. The designs conform to International Commission on Large Dams (ICOLD) bulletins and seek to also stay aligned with recognised industry good practice. They also align to the more detailed tailings industry guidelines related to the facilities geography, for example, the Australian National Committee on Large Dams (ANCOLD), the Canada Dam Association (CDA) or European Union Legislative Directives. Following the unscheduled stop of production at Cobre Panamá, we have ensured the long-term safety and environmental integrity of the site, including its TSF. This includes ongoing geotechnical quality assurance and control, monitoring, and embankment erosion control.

You can read more about our approach to tailings storage management on pages 48 – 50 of our ESG report here [LINK TO ESG REPORT].

Our own internal reviews, combined with third party independent reviews, ensure that we follow best practices and maintain safe storage at our tailings facilities.

All tailings storage facilities are subject to either quarterly or biannual inspections, risk review and reporting by an external specialist. External consultants interpret collected monitoring data including piezometric, freeboard, beach length and other data relevant to the specific facility on at least an annual basis and more frequently when required by site conditions.

In addition, we run our own internal annual risk assessment process with oversight by group and senior management and the EH&S and CSR committee of the Board. Our risk assessment process assesses the effectiveness of in place critical controls and introduces others if required to manage material risk. All sites are subject to regular internal audit according to our Tailings and Dams Management System. Managing tailings is as much about managing the water as the tailings themselves and we conduct regular tailings beach length surveys, tailings deposition planning and, embankment inspections for erosion, seepage and slumping. Group technical staff regularly reviews the operations with mine management and makes any recommendations that continually improve all aspects of the facilities operations.

Stay up to date

Sign up to receive updates with insights and stories from around First Quantum, our operations, our projects and our communities.

Sign up